Fabrication of structural steel, delivery, finishing, and erection of steel melt shop factory.
All buildings, warehouses, service halls and structural equipment including a 160 tons crane
Project Name: MedSteel S.A.
Site location: Adra Industrial City
Total Contract: 5,600 metric tons of structural steel for the main manufacturing warehouse and infrastructural buildings.
Sections: Main warehouse, bullets storage, cranes, cladding and other services buildings.
Time Schedule: 6 months for main building and 2 more additional months for other building.
Technical Specs: SVAI and AISC-ASD89 – American Institute of Steel Construction
SOW: Materials supplement, design, detailing, fabrication, design revision, paint and finishing, delivery to the site, erection and all needed materials, equipment and supplies for the erection. |